Thank you for your patience while we retrieve your images.


68 of 74 photos
Thumbnails
Info
Categories & Keywords

Category:Architecture and Structures
Subcategory:Roads
Subcategory Detail:
Keywords:co-use, wildlife, flow, hydrology, water, drainage, culvert, bridge, construction, highway, road, gold, A0203, National Road, paved, gravel, copper, Ivanhoe, Rio Tinto, mitigation, mining, mine, Gobi, road ecology
Photo Info

Dimensions7360 x 4912
Original file size19.9 MB
Image typeJPEG
Color spacesRGB
Date taken19-Feb-13 17:59
Date modified21-Apr-13 14:13
Shooting Conditions

Camera makeNIKON CORPORATION
Camera modelNIKON D800
Focal length19 mm
Focal length (35mm)19 mm
Max lens aperturef/2.8
Exposure1/500 at f/11
FlashNot fired, compulsory mode
Exposure bias+2/3 EV
Exposure modeAuto
Exposure prog.Aperture priority
ISO speedISO 800
Metering modePattern
Digital zoom1x
Finished and unfinished road section from Oyu Tolgoi (mine site) to Gashuun Sukhait (border Mongolia/China), Gobi, Ömnögovi, Mongolia

Finished and unfinished road section from Oyu Tolgoi (mine site) to Gashuun Sukhait (border Mongolia/China), Gobi, Ömnögovi, Mongolia

Bridge (about 10-12 m wide) under construction on road section from Oyu Tolgoi (mine site) to Gashuun Sukhait (border Mongolia/China), Gobi, Ömnögovi, Mongolia. This bridge is designed for water that may flow here after rare rain fall. The structure may also be used by wildlife under certain circumstances.