Thank you for your patience while we retrieve your images.


89 of 139 photos
Thumbnails
Info
Categories & Keywords

Category:Architecture and Structures
Subcategory:Roads
Subcategory Detail:
Keywords:removing, removal, streams, stream, cleaning, clean, soil, infiltration, sediment, sediments, slow down, velocity, hydrology, water, water flow, catchment, catch, basin, last, sturdy, life span, test of time, insufficiently, insufficient, durable, materials, disintegrating, disintegrated, disintegrate, crumble, concrete, post, posts, installation, design, safety, human, highways, highway, fenced road corridor, road corridor, road, fenced, fence, enter, drainage, gap, barrier, barriers, wildlife fence, wildlife fencing, measures, mitigation, mitigate, wildlife, motorway, SP-225
Photo Info

Dimensions6000 x 4000
Original file size16.7 MB
Image typeJPEG
Basin to reduce the velocity and quantity of water and allow infiltration and associated removal of sediments in the soil rather than a stream, along SP-225 motorway, São Paulo, Brazil

Basin to reduce the velocity and quantity of water and allow infiltration and associated removal of sediments in the soil rather than a stream, along SP-225 motorway, São Paulo, Brazil

Basin to reduce the velocity and quantity of water and allow infiltration and associated removal of sediments in the soil rather than a stream, along SP-225 motorway, São Paulo, Brazil